map
INDUSTRY

India

Noamundi

PV | Diesel | Grid

Client
Tata Steel
UPP Control System
PV and Diesel Energy supply for an Iron ore Mine
India
Left
For our customer TATA, a system control for an iron mine was installed in June 2017 in the Indian city of Noamundi. Our UPP System connects the newly erected photovoltaic system with the existing diesel generators. Diesel, PV, grid power supply and all switching devices for the medium voltage systems are now fully automatic to ensure a stable power supply and a maximum of diesel fuel saving. In addition, extensive monitoring and automatic fault detection system was installed.

System Type

PV | Diesel | Grid

Installation Type

UPP control system

Sunshine Hours Noamundi

2803 hours / year

SIZE

Size of Plant Diesel

5,000

kVA

Size of Plant PV

2,860

kWp

SAVINGS

Savings Diesel

1,300,000

liter / year

Savings Energy

4,261,000

kWh / year

Savings CO2

2,982,000

kg / year

Subscribe the DHYBRID-Newsletter

Do you want to be notified about new products, shows and specials?
Get the latest news and infos and join our email newsletter.

E-Mail *
First Name
Last Name
Gender   male       female
close