INDUSTRY
India
Noamundi
PV | Diesel | Grid
Client
Tata Steel
UPP Control System
PV and Diesel Energy supply for an Iron ore Mine
PV and Diesel Energy supply for an Iron ore Mine
For our customer TATA, a system control for an iron mine was installed in June 2017 in the Indian city of Noamundi. Our UPP System connects the newly erected photovoltaic system with the existing diesel generators. Diesel, PV, grid power supply and all switching devices for the medium voltage systems are now fully automatic to ensure a stable power supply and a maximum of diesel fuel saving. In addition, extensive monitoring and automatic fault detection system was installed.
System Type
PV | Diesel | Grid
Installation Type
UPP control system
Sunshine Hours Noamundi
2803 hours / year
SIZE
Size of Plant Diesel
5,000
kVA
Size of Plant PV
2,860
kWp
SAVINGS
Savings Diesel
1,300,000
liter / year
Savings Energy
4,261,000
kWh / year
Savings CO2
2,982,000
kg / year